Thursday 20 April 2017

Second top tunnel covered

Ended up with another spare 10 mins this afternoon so covered the second top tunnel panel with the green "leather" I've bought. I covered the cut out sections with some IVA trim to help protect the cables that run through the holes.

Only one left to do, but will wait until the gearbox is in so I know where to cut for the gear lever.



No comments:

Post a Comment